AI-Ready Liquid Cooling Integrator

Where the watts meetthe water.

Iron Grid owns the integration layer between power delivery and direct-to-chip or immersion cooling for 60–150 kW/rack AI data centers. Most contractors hand off at the rack PDU. We don't.

150 kW
max rack density we co-design
4 → 22
active projects, year 1 to year 3
$45K
blended monthly revenue per project
HQ · Iron Grid Campus
Iron Grid Electric & Water corporate headquarters
Liquid loop temp Δ
12.4°C
01 · The gap

Rosendin runs the conduit.
Cupertino lands the busway.
Holder pours the slab.

Nobody owns what happens between the CDU and the chip. That seam is where most AI deployments fail: thermal interlocks, leak detection, redundancy mismatch, controls drift.

Rosendin Electric
Electrical scope. Stops at the rack PDU.
Cupertino Electric
Power infrastructure. Doesn't own cooling.
Holder / DPR
GC + structural. Subs out the MEP.
Specialty MEP
Cooling-first. Misses the electrical interlock.
Iron Grid Electric & Water
We design the seam. Then we install it.
02 · What we own

Six scopes. One contract. One throat to choke.

01
Power delivery
Medium-voltage to busway, switchgear, UPS lineup, rack PDU.
02
Liquid cooling
Manifold layout, CDUs, immersion tanks, RDHX, secondary loop.
03
Co-design
Power-cooling interlock, thermal sims, redundancy matched N+1.
04
Controls
DCIM, leak-detection trip logic, BMS-to-IT hand-off protocols.
05
Risk & schedule
Lead-time-aware critical path. We won't pretend a CDU ships in 12 weeks.
06
Commissioning
L1-L5 commissioning across both scopes. Single sign-off.
03 · Who we build for

Three verticals. One integration playbook.

From AI hyperscale halls to federal-clearance facilities to enterprise campus modernizations — we deliver the same co-designed seam.

Data Center Operators
01 · Hyperscale AI
Data Center Operators

Liquid-cooled GPU halls, direct-to-chip and immersion. We engineer the power-to-coolant interlock for 60–150 kW/rack densities.

150 kW
max rack
L1-L5
commissioning
Government Facilities
02 · Federal & DoD
Government Facilities

Cleared work for federal AI labs and DoD compute. Buy-American compliance, controlled access, and audited handoff documentation.

FAR / DFARS
compliant
BABA
ready
Commercial Campuses
03 · Enterprise
Commercial Campuses

Colo retrofits and on-prem AI clusters. We re-plumb power and cooling without stranding the existing white-space.

Brownfield
specialist
48 hr
scoping
04 · The integration layer

Watts in, heat out — interlocked by design.

Every kilowatt that enters a rack must leave as heat in the loop within the same second. Legacy contractors treat that as two contracts. We treat it as one physical system.

12.4°C
Δ supply / return
45°C
GPU junction max
N+1
loop redundancy
< 80 ms
leak-trip interlock
POWER · 480V
W1/W2 · 22°C
150 kW
rack
Switchgear · UPS · Busway
CDU · Manifold · Direct-to-Chip
05 · Strategic partner
Theron Energy · exclusive integrator

Fuel-free, container-shipped, grid-independent power.

We are the integration partner for Theron Energy permanent-magnet generators — 40-ft ISO-container units that drop on a pad and close the gap between utility interconnect timelines and AI compute demand.

0
fuel inputs
40 ft
ISO container
< 12 wk
to energized
N+1
redundancy
Theron · Containerized PMG
Theron Energy containerized fuel-free permanent magnet generators
Continuous output
2.4 MW
per container · scalable in parallel
06 · Field

The build is loud. The integration is quiet.

Inside the platform
Hyperscale Build · Hillsboro
Project · 01
Hyperscale Build · Hillsboro
Direct-to-chip · 80 kW/rack
Federal AI Lab · Oak Ridge
Project · 02
Federal AI Lab · Oak Ridge
Immersion · 120 kW/rack
Colo Retrofit · Ashburn
Project · 03
Colo Retrofit · Ashburn
Hybrid · 60-90 kW/rack
07 · Bench

We're embedded with the OEMs that ship the kit.

Pre-engineered against Vertiv, Schneider, CoolIT, Motivair, and the cooling skids that actually meet AI-cluster lead times.

Vertiv ·Schneider Electric ·CoolIT Systems ·Motivair ·ABB ·Eaton ·Submer ·GRC ·nVent ·Vertiv ·Schneider Electric ·CoolIT Systems ·Motivair ·ABB ·Eaton ·Submer ·GRC ·nVent ·

Spinning up a
100+ kW/rack build?

We work with a small number of teams at a time. Tell us your rack target, your cooling preference, and your COD. We'll come back in 48 hours with a scope.